Hi
I have setup a route with 1 operation. On the operation i have 3 resources, but when i estimate my Production cost, i only see the cost for the 1 resource.
I have grouped my 3 resources under a resource group
Resources listed
resource 00002 and 000003 have the Cost categories below
Labour Cost have the below labour cost
Resource Prod have the cost categories below
Manufacturing cost has the below cost
When i do my Estimate on my production order i get the below. Only my PROD resource cost is included
Please guide me in the direction where i must go and investigate, is my thinking correct? or is there another way of achieving what i want to do.
Thanks