Hi Guys,
I need to run Batch Jobs with the following schedule.
Batch 1 = Run the jobs every Sunday of the week
-if we have 4-5 weeks in the month, therefore i have 4-5 reports in a month
Batch 2 = Run every 1st day of the Month
-We have 12 months in 1 year, therefore i have 12 reports in a year.
i already read this link- Recurrence
TIA.