Hi,

I want to calcualte MRP against a specific MPS through the Planning Worksheet. Presently the system generates MRP for all the MPS and pending Production Orders. How do I configure so the MRP is generated for the specific MPS.
  • Hi Deepak

    The only way you could achieve this is to filter the MPS generation on teh run, and then filter the MRP on the same settings. This is not feasible unless the componenets of any parents have the same attributes as the parent, or your MPS will plan one set of items and the MRP from the MPS will miss out items required to fulfill your MPS. I am afraid this functionality is not standard.