Hi, I have this specifies manufacturing scenario that I want to setup in the system and I need bit of advise on how to get this working in the most effective way; We use NAV 5.0 We have Item A that we sell and it’s made of Item X which is the raw material which we purchase. Item A goes through...
Posted to
Dynamics NAV / Navision - Supply Chain Management and Manufacturing Forum
(Forum)
by
chaminda
on
Nov 10, 2009
Filed under: Manufacturing, Planning worksheet, MRP, Inventory Costs, Phantom BOM, Dynamics NAV, Production, Manufacturing Subcontracting, Production Costing, Productiontion, MPS, NAV 5.0
-
Hi, I have this specifies manufacturing scenario that I want to setup in the system and I need bit of advise on how to get this working in the most effective way; We use NAV 5.0 We have Item A that we sell and it’s made of Item X which is the raw material which we purchase. Item A goes through...
Posted to
Dynamics NAV / Navision - Supply Chain Management and Manufacturing Forum
(Forum)
by
chaminda
on
Nov 10, 2009
Filed under: Manufacturing, Planning worksheet, MRP, Inventory Costs, Phantom BOM, Dynamics NAV, Production, Manufacturing Subcontracting, Production Costing, Productiontion, MPS, NAV 5.0