Hi, I have this specifies manufacturing scenario that I want to setup in the system and I need bit of advise on how to get this working in the most effective way; We use NAV 5.0 We have Item A that we sell and it’s made of Item X which is the raw material which we purchase. Item A goes through...
Posted to
Dynamics NAV / Navision - Supply Chain Management and Manufacturing Forum
(Forum)
by
chaminda
on
Nov 10, 2009
Filed under: Manufacturing, Planning worksheet, MRP, Inventory Costs, Phantom BOM, Dynamics NAV, Production, Manufacturing Subcontracting, Production Costing, Productiontion, MPS, NAV 5.0
-
Hello.... Can someone explain to me the purpose of the Cost Amount(Expected) filed in Value Entires table please? How this is calculated and what are the expeted G/L entires when Consumption and Output is posted? We're using NAV 5.0 and in Inventory Setup - Automatic Cost posting and Expected Cost...
-
I'm testing Manufacturing in NAV 5.0. I created a Production order, now when I click on Production Journal I get "You cannot use a Unit of Measure Code because MyLocation is set up with Direcrted Put-away and Pick". I am stuck. I don't really want to do Prod. orders in a different location...
-
Hi, I have this specifies manufacturing scenario that I want to setup in the system and I need bit of advise on how to get this working in the most effective way; We use NAV 5.0 We have Item A that we sell and it’s made of Item X which is the raw material which we purchase. Item A goes through...
Posted to
Dynamics NAV / Navision - Supply Chain Management and Manufacturing Forum
(Forum)
by
chaminda
on
Nov 10, 2009
Filed under: Manufacturing, Planning worksheet, MRP, Inventory Costs, Phantom BOM, Dynamics NAV, Production, Manufacturing Subcontracting, Production Costing, Productiontion, MPS, NAV 5.0
-
Hello.... Can someone explain to me the purpose of the Cost Amount(Expected) filed in Value Entires table please? How this is calculated and what are the expeted G/L entires when Consumption and Output is posted? We're using NAV 5.0 and in Inventory Setup - Automatic Cost posting and Expected Cost...
-
I'm testing Manufacturing in NAV 5.0. I created a Production order, now when I click on Production Journal I get "You cannot use a Unit of Measure Code because MyLocation is set up with Direcrted Put-away and Pick". I am stuck. I don't really want to do Prod. orders in a different location...
-
There are additional major functionalties in 5.x that's not available in 2.x. for example: 1. CRM 2. Warehouse Management 3. Improved Costing analysis 4. Landed Cost capbility 5. Prepayments 6. Kits 7. Manufacturing If none of these major functionalities satisfies your business requirement, then...
Posted to
Dynamics NAV / Navision - Developers Forum
(Forum)
by
Alex Chow
on
Mar 29, 2007
Filed under: NAV 5.0, NAV 5.1, upgrade, Navision 2.60, Prepayments, Kitting, Warehouse management, Manufacturing, NAV CRM, Landed Costs
-
Folks, When Finishing production order, the system will halt on a production order line that has consumption posted but zero output. In fact it's clear on what should be done to fix this. User must post at least 1 output for that prod. order line to allow the production order to change status as...
-
The Put-Away Template code settings look like this: The UOM on the item card and on the Put away is the same. Not sure where to go from here. I don't want to disable directed putaways on the location card. Thanks for the help.
-
The Put-Away Template code settings look like this: The UOM on the item card and on the Put away is the same. Not sure where to go from here. I don't want to disable directed putaways on the location card. Thanks for the help.