Hi, I have this specifies manufacturing scenario that I want to setup in the system and I need bit of advise on how to get this working in the most effective way; We use NAV 5.0 We have Item A that we sell and it’s made of Item X which is the raw material which we purchase. Item A goes through...
Posted to
Dynamics NAV / Navision - Supply Chain Management and Manufacturing Forum
(Forum)
by
chaminda
on
Nov 10, 2009
Filed under: Manufacturing, Planning worksheet, MRP, Inventory Costs, Phantom BOM, Dynamics NAV, Production, Manufacturing Subcontracting, Production Costing, Productiontion, MPS, NAV 5.0
-
Hi, Hi, I need your valuable help regarding the Research & development. Let’s say we have two companies A, B. A is bulk drug & formulations company. A is a parent company ( they will do production) B is a sister company of A (they will do research & development). Company B is interested...
-
Hi, My environment is Nav 4. 0 Sp3 HF6. This is a Manufacturin company . It has 3 production plants in different states. One database for 3 states. Company has 3 locations that is Plant 1 , Plant 2 , Plant 3. Company will purchase Rawmaterial Location wise .In 3 production plants they produce finished...
-
Hi, I have this specifies manufacturing scenario that I want to setup in the system and I need bit of advise on how to get this working in the most effective way; We use NAV 5.0 We have Item A that we sell and it’s made of Item X which is the raw material which we purchase. Item A goes through...
Posted to
Dynamics NAV / Navision - Supply Chain Management and Manufacturing Forum
(Forum)
by
chaminda
on
Nov 10, 2009
Filed under: Manufacturing, Planning worksheet, MRP, Inventory Costs, Phantom BOM, Dynamics NAV, Production, Manufacturing Subcontracting, Production Costing, Productiontion, MPS, NAV 5.0
-
Hi, Hi, I need your valuable help regarding the Research & development. Let’s say we have two companies A, B. A is bulk drug & formulations company. A is a parent company ( they will do production) B is a sister company of A (they will do research & development). Company B is interested...
-
Hi, My environment is Nav 4. 0 Sp3 HF6. This is a Manufacturin company . It has 3 production plants in different states. One database for 3 states. Company has 3 locations that is Plant 1 , Plant 2 , Plant 3. Company will purchase Rawmaterial Location wise .In 3 production plants they produce finished...
-
Hi, I want to add something :NAV work with a Manufacturing-SCM method called MRP2 (MRPII) : Manufacturing Ressources Planning. LLC : Low Level Code : Item A is the Finished Good so it has an LLC =0. Item B is a component of A : so it has an LLC(B) = LLC(A)+1 =1 Item C is a component of B : LLC(C) = LLC...
-
Thanks AdamRoue,I m working with "Location Mandatory" in "Inventory setup". and "Use Forecast on Locations" = Yes in "manufacturing setup". And for item's setup i m sure that all is right... Perhaps some Hotfixes or Modifications on the database make this....
-
Hi All,
I am getting an error while planning the sales demand through planning worksheet. Reservation entry is getting activated for the requirements.
I have not specified any reservation for the item and also in the customer card. Howcome it gets activate automatically? Is it mandatory for the...
-
Hi experts, Thank you to everybody who are giving a good support to me. I gone through the manufacturing manual . I could not understand the what is exact difference between MRP and MPs. could any body explain with example . thanks and regards