Flushing and Consumption Posting in multiple steps

Get our Free Newletter

Don't you have the time to be online here at DUG every day? So how do you follow what is going on in the Dynamics industry and community?
If you subscribe to the DUG Newsletter then you can relax! We will make sure that you don't miss the big news!

Check out our
Newsletter Subscription Center
page a complete list of our different newsletters.

This post has 3 Replies | 0 Followers

333 Posts
2,205 Points
Joined: 2002-4-17
Last Online:
2007-3-13 5:52
Location: Trini Trinidad and Tobago
nav nav Posted: 2003-8-26 21:17 | Locked
Consider the following (partially) parallel routing for item MASTER :

Operation | Prev. Op | Next Op. | Work Center
----10----|----------|-20|30----|---start---
----20----|---10-----|---40-----|----100----
----30----|---10-----|---40-----|----110----
----40----|--20|30---|-50|60----|---join----
----50----|---40-----|---70-----|----200----
----60----|---40-----|---70-----|----210----
----70----|---50|60--|----------|----end----

At 100/110 a intermediate product is formed SLAVE, with production bom header "Slave" :

BOM Header Code : "Slave"
BOM Header Lines :
Item ------- A ------ 1 ---PCS
Item ------- B ---1 ---PCS

At 200/210 the final product is formed MASTER, with production bom header "Master" :

BOM Header Code : "Master"
Item ------- C ------ 1 ---PCS
Prod. Bom -Slave ------ 1 ---PCS (phantom Bom)

Additional information :
- A and B are consumed at 100
- C and SLAVE are consumed at 200
(Routing link codes are not (yet) set up.

A production order looks like this :
Prod Order Line : Master
Prod Order Component Lines : C, A, B
Prod Order Routing Lines : Routing as described abovee

So there is 1 and only 1 production order.

Objectives :
- Step 1 : backflush A & B, and manually post the output of step 100/110.
- Step 2 : backflush C & SLAVE, and manually post the output of 200/210

Step 1 and 2 are 2 distinct posting steps.

How ?
- Do I set all materials A, B, C and SLAVE to backflush ?
- Do I set all work centers flushing to manual ?
- Do I set up routing link codes, to link the consumption of A, B to 100, 110 ?
- Do I set up routing link codes, to link the consumption of C, Slave to 200, 210 ?

But will this still allow me to process my production order in 2 distinct posting steps (step 1 and step 2) ?
Male
11,105 Posts
179,297 Points
Joined: 2000-11-3
Last Online:
2014-10-24 18:54
Location: UK
DynamicsNAVMVP
Moderator
AdamRoue replied on 2003-9-1 12:22 | Locked
Hi Gunther

Could you explain to me the purpose of the SLAVE item in your two stage flushing. The SLAVE is set as a phantom BOM that usually describes a transitional item, which indeed seems to be the case of the routing, however your consumption shows the components downdated at one stage, the SLAVE at the next. Can you explain the need to downdate Item's A and B at 100 and again at 200 (as that is what the SLAVE really is).

I suppose my question is why not downdate A and B at 200 and ignore the Production BOM as you cannot use routing link codes with them.

“Any fool can know. The point is to understand.”
Albert Einstein

Male
11,105 Posts
179,297 Points
Joined: 2000-11-3
Last Online:
2014-10-24 18:54
Location: UK
DynamicsNAVMVP
Moderator
AdamRoue replied on 2003-9-1 14:32 | Locked
Hi Gunther

This solution is tailored for your primary concern of processing the order in two distinct steps. I have given no thought to the costing implications of my solution [:D]. I will leave this up to you to investigate further.

Production BOM - "MASTER"
TYPE..NUMBER..QTY..ROUTING LINK CODE
ITEM..ITEMA....1.....400
ITEM..ITEMB....1.....400
ITEM..SLAVE....-1....400
ITEM..SLAVE....1.....500
ITEM..ITEMC....1.....500

Routing - parallel "MASTER"
OP..PREV.OP...NEXT OP..TYPE..NUMBER..ROUTING LINK CODE
10...................20|30....WC....START
20...10..............40.......WC....100
30...10..............40.......WC....110........400
40...20|30........50|60....WC....JOIN
50...40..............70.......WC....200
60...40..............70.......WC....210........500
70...50|60....................WC....END

Item and Work Centre Settings.
All of the work centres are set to manual flushing
All of the items: A, B, C, SLAVE and MASTER are set to backward flush.
Naturally you can set this up how you want to.

quote:
Objectives :
- Step 1 : backflush A & B, and manually post the output of step 100/110.
- Step 2 : backflush C & SLAVE, and manually post the output of 200/210


Once an output journal is recorded for operation 60 at WC 110 items A and B will be backflushed automatically. SLAVE will be put into stock.

Once an output journal is recorded for operation 30 at WC 210 items C and SLAVE will be backflushed automatically.

quote:
How ?
Q1 - Do I set all materials A, B, C and SLAVE to backflush ?
Q2 - Do I set all work centers flushing to manual ?
Q3 - Do I set up routing link codes, to link the consumption of A, B to 100, 110 ?
Q4 - Do I set up routing link codes, to link the consumption of C, Slave to 200, 210 ?


Q1 - YES
Q2 - YES
Q3 - WELL I SET THEM UP TO OP 110 - YOU CAN RECONFIGURE THIS IF IT IS STAGGERED, ALTHOUGH AS A AND B MAKE SLAVE I WOULD ADVISE THIS IS DONE LOGICALLY AT THE SAME OP.
Q4 - AGAIN AS Q3.

I hope this helps. [:D]

“Any fool can know. The point is to understand.”
Albert Einstein

333 Posts
2,205 Points
Joined: 2002-4-17
Last Online:
2007-3-13 5:52
Location: Trini Trinidad and Tobago
nav nav replied on 2003-9-3 21:08 | Locked
Well, I wasn't far off ... for once.

Thanks !